Project Studies: El Paso District

Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are  analyzed to determine if they are cost effective, while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.

Location Project Description
El Paso Loop 375 Border Highway West Proposed construction of a new four-lane controlled access toll facility that connects Loop 375 to US 85.
El Paso Comprehensive Mobility Plan An overall mobility strategy affecting El Paso and the surrounding area.
El Paso I-10 Schuster Ramp Interchange and ramp improvements at I-10 westbound and Schuster Ave.
El Paso Loop 375 Transmountain West Improvements from I-10 to east of the Franklin Mountain State Park Entrance.
El Paso Northeast Parkway A potential 21-mile highway connecting Loop 375 to I-10 in Anthony, New Mexico.
El Paso SPUR 601 A proposed 7.4 mile road connecting US 54 and Loop 375.
El Paso US 54 The proposed widening of US 54 from Yandell Drive to Hondo Pass Drive.

Back button