COUNTY: KARNES HIGHWAY: FM 2102 LENGTH: 0MI CONTROL NUMBER: 2234-02-009 SBE GOAL: 0.0 % PROJECT NUMBER: C 2234-2-9 TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 238 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM MAY 02, 2024*EST.COST: 8,238,066.88 BIDS WILL BE OPENED: 1:00 PM MAY 02, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONNICK NOVOSAD ATTN: CONSTRUCTION DIVISION - M1C3.02 800 S 181 6230 E. STASSNEY LANEKARNES CITY, TX 78118 AUSTIN TX 78744-3147830/780-3993 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: FM 626 LIMITS TO: FM 99 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 371.6001 100 6006PREP ROW (TREE)(LESS THAN 24" DIA)EA 15.0002 100 6007PREP ROW (TREE)(GREATER THAN 24" DIA)EA 20.0003 110 6001EXCAVATION (ROADWAY)CY 420.0004 112 6001SUBGRADE WIDENING (ORD COMP)STA 371.6005 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 6,384.0006 150 6002BLADINGHR 50.0007 164 6021CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)SY 99,088.0008 164 6051DRILL SEED (TEMP)(WARM OR COOL)SY 24,772.0009 168 6001VEGETATIVE WATERINGMG 1,600.00010 169 6004SOIL RETENTION BLANKETS (CL 1) (TY D)SY 1,000.00011 169 6006SOIL RETENTION BLANKETS (CL 2) (TY F)SY 1,000.00012 216 6001PROOF ROLLINGHR 28.00013 247 6041FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)CY 30,521.00014 247 6508FL BS (RDWY DEL)(TYA GR 1, 2 OR 5)F POSCY 12,253.00015 275 6001CEMENTTON 1,687.00016 275 6025CEM TRT (MX EXST MTL & NW BS)(DC)(6")SY 138,864.00017 316 6029ASPH (RC-250)GAL 26,425.00018 316 6177AGGR(TY-B GR-5 SAC-B)CY 979.00019 316 6413ASPH(AC-15P, HFRS-2P OR CRS-2P)GAL 97,767.00020 316 6427AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)CY 1,201.00021 316 6430AGGR(TY-PB GR-3 OR TY-PB GR-3S)(SAC-B)CY 1,554.00022 351 6002FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")SY 666.00023 400 6005CEM STABIL BKFLCY 512.00024 400 6006CUT & RESTORING PAVSY 307.00025 402 6001TRENCH EXCAVATION PROTECTIONLF 131.00026 432 6035RIPRAP (STONE PROTECTION)(24 IN)CY 44.00027 460 6002CMP (GAL STL 18 IN)LF 1,236.00028 462 6012CONC BOX CULV (6 FT X 5 FT)LF 42.00029 462 6056CONC BOX CULV (6 FT X 5 FT)(EXTEND)LF 100.00030 464 6003RC PIPE (CL III)(18 IN)LF 492.00031 464 6005RC PIPE (CL III)(24 IN)LF 948.00032 464 6007RC PIPE (CL III)(30 IN)LF 240.00033 464 6008RC PIPE (CL III)(36 IN)LF 120.00034 464 6009RC PIPE (CL III)(42 IN)LF 210.00035 467 6227SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)EA 18.00036 467 6348SET (TY II) (18 IN) (CMP) (6: 1) (P)EA 88.00037 467 6358SET (TY II) (18 IN) (RCP) (4: 1) (C)EA 6.00038 467 6390SET (TY II) (24 IN) (RCP) (4: 1) (C)EA 32.00039 467 6419SET (TY II) (30 IN) (RCP) (4: 1) (C)EA 8.00040 467 6450SET (TY II) (36 IN) (RCP) (4: 1) (C)EA 4.00041 467 6461SET (TY II) (42 IN) (RCP) (3: 1) (C)EA 3.00042 467 6463SET (TY II) (42 IN) (RCP) (4: 1) (C)EA 3.00043 496 6016REMOV STR (PIPE)EA 33.00044 500 6001MOBILIZATIONLS 1.00045 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 14.00046 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 200.00047 506 6011ROCK FILTER DAMS (REMOVE)LF 200.00048 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 111.00049 506 6024CONSTRUCTION EXITS (REMOVE)SY 111.00050 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 800.00051 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 800.00052 506 6042BIODEG EROSN CONT LOGS (INSTL) (18")LF 120.00053 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 120.00054 530 6003INTERSECTIONS (SURF TREAT)SY 824.00055 530 6005DRIVEWAYS (ACP)SY 2,236.00056 530 6006DRIVEWAYS (SURF TREAT)SY 1,526.00057 530 6009TURNOUTS (SURF TREAT)SY 73.00058 560 6004MAILBOX INSTALL-S (TWG-POST) TY 2EA 4.00059 560 6005MAILBOX INSTALL-D (TWG-POST) TY 2EA 1.00060 644 6027IN SM RD SN SUP&AM TYS80(1)SA(P)EA 30.00061 644 6028IN SM RD SN SUP&AM TYS80(1)SA(P-BM)EA 5.00062 644 6030IN SM RD SN SUP&AM TYS80(1)SA(T)EA 9.00063 644 6037IN SM RD SN SUP&AM TYS80(1)SA(U-WC)EA 3.00064 644 6076REMOVE SM RD SN SUP&AMEA 47.00065 658 6073INSTL OM ASSM (OM-2Y)(WC)GND(BI)EA 28.00066 662 6035WK ZN PAV MRK NON-REMOV (Y)6"(BRK)LF 6,363.00067 662 6037WK ZN PAV MRK NON-REMOV (Y)6"(SLD)LF 41,197.00068 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 1,855.00069 666 6284REF PROF PAV MRK TY I(W)6"(SLD)(060MIL)LF 74,188.00070 666 6289REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)LF 41,197.00071 666 6293REF PROF PAV MRK TY I(Y)6"(BRK)(090MIL)LF 6,363.00072 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 84.00073 672 6009REFL PAV MRKR TY II-A-AEA 835.00074 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00075 60566002PREFORMED CENTERLINE RUMBLE STRIPLF 943.00076 61856002TMA (STATIONARY)DAY 285.00077 61856003TMA (MOBILE OPERATION)HR 75.00078 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK $60,000.00