COUNTY: UPSHUR HIGHWAY: FM 556 LENGTH: 0.1660MI CONTROL NUMBER: 2030-01-011 DBE GOAL: 5.0 % PROJECT NUMBER: BR 2B24(032) TYPE: BRIDGE REPLACEMENT TIME FOR COMPLETION: WORKING DAYS BY CONTRACTOR **GUARANTY: 62,000.00 BIDS RECEIVED UNTIL: 1:00 PM MAY 03, 2024*EST.COST: 3,078,355.15 BIDS WILL BE OPENED: 1:00 PM MAY 03, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONWENDY STARKES ATTN: CONSTRUCTION DIVISION - M1C3.02 300 EAST LOOP 390 N 6230 E. STASSNEY LANEMARSHALL, TX 75670 AUSTIN TX 78744-3147903/935-2809 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: LITTLE CYPRESS CREEK LIMITS TO: . ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6005PREP ROW (TREE)(24"-30"DIA)EA 1.0001 104 6009REMOVING CONC (RIPRAP)SY 82.0002 104 6054REMOVING CONCRETE(MOW STRIP)LF 534.0003 105 6014REMOVING STAB BASE & ASPH PAV (7"-12")SY 3,333.0004 110 6001EXCAVATION (ROADWAY)CY 708.0005 132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY 2,556.0006 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 5,464.0007 164 6054BOND FBR MTRX SEED (PERM)(RURAL)(SAND)SY 5,464.0008 164 6055BONDED FBR MTRX SEED (TEMP)(WARM)SY 2,732.0009 164 6056BONDED FBR MTRX SEED (TEMP)(COOL)SY 2,732.00010 168 6001VEGETATIVE WATERINGMG 175.00011 169 6002SOIL RETENTION BLANKETS (CL 1) (TY B)SY 950.00012 247 6236FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)CY 976.00013 275 6001CEMENTTON 127.00014 275 6010CEMENT TREAT (SUBGRADE) (8")SY 4,391.00015 275 6078CEMENT TREAT (NEW BASE)(DC)(8")SY 4,383.00016 310 6009PRIME COAT (MC-30)GAL 1,097.00017 400 6005CEM STABIL BKFLCY 141.00018 401 6001FLOWABLE BACKFILLCY 40.00019 416 6002DRILL SHAFT (24 IN)LF 450.00020 416 6004DRILL SHAFT (36 IN)LF 440.00021 420 6014CL C CONC (ABUT)(HPC)CY 29.00022 420 6030CL C CONC (CAP)(HPC)CY 34.20023 420 6038CL C CONC (COLUMN)(HPC)CY 12.70024 422 6008REINF CONC SLAB (SLAB BEAM)(HPC)SF 7,849.00025 422 6016APPROACH SLAB (HPC)CY 84.40026 425 6011PRESTR CONC SLAB BEAM (4SB15)LF 672.01027 425 6012PRESTR CONC SLAB BEAM (5SB15)LF 1,008.01028 432 6006RIPRAP (CONC)(CL B)CY 2.60029 432 6031RIPRAP (STONE PROTECTION)(12 IN)CY 909.00030 432 6039BEDDING MATERIAL (6 IN)CY 208.00031 432 6045RIPRAP (MOW STRIP)(4 IN)CY 40.00032 450 6111RAIL (TY SSTR) (W/DRAIN SLOT) (HPC)LF 364.00033 454 6003ARMOR JOINTLF 89.00034 454 6004ARMOR JOINT (SEALED)LF 128.00035 496 6010REMOV STR (BRIDGE 100 - 499 FT LENGTH)EA 1.00036 496 6043REMOV STR (SMALL FENCE)LF 447.00037 500 6001MOBILIZATIONLS 1.00038 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 11.00039 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 60.00040 506 6003ROCK FILTER DAMS (INSTALL) (TY 3)LF 100.00041 506 6011ROCK FILTER DAMS (REMOVE)LF 160.00042 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 160.00043 506 6024CONSTRUCTION EXITS (REMOVE)SY 160.00044 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 2,551.00045 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 2,551.00046 506 6042BIODEG EROSN CONT LOGS (INSTL) (18")LF 391.00047 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 391.00048 540 6001MTL W-BEAM GD FEN (TIM POST)LF 562.50049 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 4.00050 542 6001REMOVE METAL BEAM GUARD FENCELF 275.00051 542 6005RM MTL BM GD FEN TRANS (T101)EA 4.00052 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 4.00053 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 4.00054 552 6003WIRE FENCE (TY C)LF 448.00055 644 6061IN SM RD SN SUP&AM TYTWT(1)WS(T)EA 2.00056 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 6.00057 658 6016INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)EA 18.00058 658 6099INSTL OM ASSM (OM-2Z)(WFLX)GNDEA 2.00059 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 150.00060 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 150.00061 666 6225PAVEMENT SEALER 6"LF 868.00062 672 6009REFL PAV MRKR TY II-A-AEA 34.00063 678 6002PAV SURF PREP FOR MRK (6")LF 868.00064 678 6033PAV SURF PREP FOR MRK (RPM)EA 6.00065 30776051SP MIXES SP-D PG70-22TON 354.00066 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 3.00067 61496004REFL PAV MRK AWT (W) 6" (SLD) (100MIL)LF 2,680.00068 61496010REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)LF 2,680.00069 61856002TMA (STATIONARY)DAY 5.00070 61856003TMA (MOBILE OPERATION)HR 60.00071 ROAD USER COST 800 6001NO. OF WORKING DAYS$/D 5,997.00072 ** THE NO. OF WORKING DAYS OF 204.000 WILL BE USED ONLY FOR BID COMPARISON AND AS A DEDUCTION OR AS A CREDIT IN ACCORDANCE WITH ITEM 8. THE ESTIMATED COST OF THIS CONTRACT DOES NOT INCLUDE THIS COST. * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $28,000.00