COUNTY: FANNIN HIGHWAY: FM 1752 LENGTH: 7.3920MI CONTROL NUMBER: 1708-01-013, ETCDBE GOAL: 2.0 % PROJECT NUMBER: STP 2018(372), ETC TYPE: REHABILITATION OF EXISTING ROAD TIME FOR COMPLETION: 250 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM DECEMBER 06, 2017*EST.COST: 5,448,166.23 BIDS WILL BE OPENED: 1:00 PM DECEMBER 06, 2017 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONAARON BLOOM ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 3904 US 75 SOUTH 200 E RIVERSIDESHERMAN, TX 75090 AUSTIN TX 78704-1204903/892-6529 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ FANNIN1708-01-013SH 56 FM 1752STP 2018(372)0.13 MI SOUTH OF US 82 LENGTH: 1.0930 MILES FANNIN1708-02-012SH 56 FM 1752C 1708-2-12FM 898 LENGTH: 6.2990 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 390.3901 104 6009REMOVING CONC (RIPRAP)SY 75.0002 104 6017REMOVING CONC (DRIVEWAYS)SY 154.0003 112 6001SUBGRADE WIDENING (ORD COMP)STA 390.2604 132 6019EMBANKMENT (VEHICLE)(ORD COMP)(TY B)CY 288.0005 134 6001BACKFILL (TY A)STA 390.2606 152 6001ROAD GRADER WORK (ORD COMP)STA 390.2607 156 6001BULLDOZER WORKHR 53.0008 158 6002SPEC EXCAV WORK (BACKHOE)HR 53.0009 164 6009BROADCAST SEED (TEMP) (WARM)SY 124,762.00010 164 6011BROADCAST SEED (TEMP) (COOL)SY 124,762.00011 164 6015STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)SY 249,523.00012 168 6001VEGETATIVE WATERINGMG 1,495.00013 169 6003SOIL RETENTION BLANKETS (CL 1) (TY C)SY 750.00014 216 6001PROOF ROLLINGHR 10.00015 247 6201FL BS (CMP IN PLC)(TY A GR 4) (8")SY 104,919.00016 251 6073REWRKING BS MATL (TY C)(10")(ORD COMP)SY 80,757.00017 275 6001CEMENTTON 956.00018 275 6003CEMENT TREAT (NEW BASE) (6")SY 104,919.00019 316 6017ASPH (AC-20-5TR)GAL 88,664.00020 316 6029ASPH (RC-250)GAL 29,378.00021 316 6403AGGR (TY-B GR-5 OR TY-L GR-5)CY 750.00022 316 6404AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)CY 935.00023 316 6440AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)CY 999.00024 340 6032D-GR HMA(SQ) TY-C SAC-B PG64-22TON 937.00025 403 6001TEMPORARY SPL SHORINGSF 2,696.00026 420 6057CL C CONC (WINGWALLS)CY 17.00027 420 6071CL C CONC (COLLAR)EA 11.00028 420 6141CL C CONC (CURB)CY 6.00029 432 6007RIPRAP (CONC)(CL C)CY 43.00030 432 6031RIPRAP (STONE PROTECTION)(12 IN)CY 87.00031 432 6033RIPRAP (STONE PROTECTION)(18 IN)CY 105.00032 432 6045RIPRAP (MOW STRIP)(4 IN)CY 147.00033 462 6024CONC BOX CULV (9 FT X 5 FT)LF 8.00034 462 6033CONC BOX CULV (10 FT X 9 FT)LF 60.00035 464 6001RC PIPE (CL III)(12 IN)LF 352.00036 464 6003RC PIPE (CL III)(18 IN)LF 600.00037 464 6005RC PIPE (CL III)(24 IN)LF 234.00038 464 6007RC PIPE (CL III)(30 IN)LF 56.00039 464 6008RC PIPE (CL III)(36 IN)LF 60.00040 464 6009RC PIPE (CL III)(42 IN)LF 12.00041 464 6010RC PIPE (CL III)(48 IN)LF 10.00042 466 6055HEADWALL (CH - FW - 45) (DIA= 42 IN)EA 1.00043 466 6097HEADWALL (CH - PW - 0) (DIA= 24 IN)EA 1.00044 466 6099HEADWALL (CH - PW - 0) (DIA= 30 IN)EA 3.00045 466 6101HEADWALL (CH - PW - 0) (DIA= 36 IN)EA 3.00046 466 6102HEADWALL (CH - PW - 0) (DIA= 42 IN)EA 2.00047 466 6103HEADWALL (CH - PW - 0) (DIA= 48 IN)EA 2.00048 466 6135HEADWALL (CH - PW - S) (DIA= 42 IN)EA 2.00049 466 6136HEADWALL (CH - PW - S) (DIA= 48 IN)EA 2.00050 466 6186WINGWALL (PW - 2) (HW=11 FT)EA 4.00051 466 6196WINGWALL (PW - 2) (HW=7 FT)EA 2.00052 466 6238HEADWALL (CH-PW-S)(DIA=42 IN)(MOD)EA 1.00053 467 6326SET (TY II) (12 IN) (RCP) (6: 1) (P)EA 95.00054 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 123.00055 467 6388SET (TY II) (24 IN) (RCP) (3: 1) (C)EA 10.00056 467 6390SET (TY II) (24 IN) (RCP) (4: 1) (C)EA 2.00057 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 26.00058 467 6417SET (TY II) (30 IN) (RCP) (3: 1) (C)EA 5.00059 467 6423SET (TY II) (30 IN) (RCP) (6: 1) (P)EA 2.00060 467 6448SET (TY II) (36 IN) (RCP) (3: 1) (C)EA 4.00061 467 6454SET (TY II) (36 IN) (RCP) (6: 1) (P)EA 4.00062 467 6474SET (TY II) (48 IN) (RCP) (3: 1) (C)EA 4.00063 472 6006REMOV & RE - LAY PIPE (24 IN)LF 44.00064 472 6008REMOV & RE - LAY PIPE (30 IN)LF 18.00065 472 6011REMOV & RE - LAY PIPE (36 IN)LF 28.00066 472 6012REMOV & RE - LAY PIPE (42 IN)LF 16.00067 472 6013REMOV & RE - LAY PIPE (48 IN)LF 16.00068 480 6001CLEAN EXIST CULVERTSEA 25.00069 496 6005REMOV STR (WINGWALL)EA 6.00070 496 6007REMOV STR (PIPE)LF 224.00071 496 6050REMOV STR (DRIVEWAY CULVERT)EA 47.00072 500 6001MOBILIZATIONLS 1.00073 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 17.00074 506 6001ROCK FILTER DAMS (INSTALL) (TY 1)LF 320.00075 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 1,820.00076 506 6011ROCK FILTER DAMS (REMOVE)LF 2,140.00077 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 5,040.00078 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 5,040.00079 530 6004DRIVEWAYS (CONC)SY 139.00080 530 6009TURNOUTS (SURF TREAT)SY 710.00081 530 6016 DRIVEWAYS (BASE)SY 4,329.00082 530 6019DRIVEWAYS (ACP)(TYPE 1)SY 96.00083 530 6021DRIVEWAYS (ACP) (TYPE 2)SY 683.00084 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 1,175.00085 540 6017MTL BM GD FEN (LONG SPAN SYSTEM)LF 100.00086 540 6020MTL W - BEAM GD FEN (LOW FILL CULVERT)LF 50.00087 542 6001REMOVE METAL BEAM GUARD FENCELF 1,200.00088 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 12.00089 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 12.00090 560 6003MAILBOX INSTALL-M (TWG-POST) TY 1EA 1.00091 560 6007MAILBOX INSTALL-S (WC-POST) TY 3EA 40.00092 560 6008MAILBOX INSTALL-D (WC-POST) TY 3EA 3.00093 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 147.00094 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 7.00095 644 6007IN SM RD SN SUP&AM TY10BWG(1)SA(U)EA 3.00096 644 6037IN SM RD SN SUP&AM TYS80(1)SA(U-WC)EA 1.00097 644 6071RELOCATE SM RD SN SUP&AM TY TWTEA 2.00098 644 6076REMOVE SM RD SN SUP&AMEA 179.00099 658 6047INSTL OM ASSM (OM-2Y)(WC)GNDEA 56.000100 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 18.000101 662 6032WK ZN PAV MRK NON-REMOV (Y)4"(BRK)LF 3,260.000102 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 69,764.000103 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 4,642.000104 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 33.000105 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 79,392.000106 666 6312RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF 3,260.000107 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 69,764.000108 672 6009REFL PAV MRKR TY II-A-AEA 1,079.000109 50016002GEOGRID BASE REINFORCEMENT (TY II)SY 110,297.000110 61856002TMA (STATIONARY)DAY 200.000111 61856003TMA (MOBILE OPERATION)HR 50.000112 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $107,615.00