COUNTY: WILSON HIGHWAY: CS LENGTH: 2.10MI CONTROL NUMBER: 0915-14-050 DBE GOAL: 3.0 % PROJECT NUMBER: STP 2023(123)TAPS TYPE: PEDESTRIAN, SIDEWALKS & CURB RAMPS TIME FOR COMPLETION: 98 WORKING DAYSGUARANTY: 15,000.00 BIDS RECEIVED UNTIL: 1:00 PM MAY 02, 2024*EST.COST: 743,921.82 BIDS WILL BE OPENED: 1:00 PM MAY 02, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONWILLIAM LOCKETT ATTN: CONSTRUCTION DIVISION - M1C3.02 4102 IH 35 SOUTH 6230 E. STASSNEY LANENEW BRAUNFELS, TX 78130 AUSTIN TX 78744-3147830/609-0707 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: D L VEST STREET LIMITS TO: TO FM 1346 SIDEWALKS ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6015REMOVING CONC (SIDEWALKS)SY 133.0001 104 6017REMOVING CONC (DRIVEWAYS)SY 1,170.0002 104 6028REMOVING CONC (MISC)SY 12.0003 104 6029REMOVING CONC (CURB OR CURB & GUTTER)LF 126.0004 104 6032REMOVING CONC (WHEELCHAIR RAMP)SY 47.0005 104 6044REMOVING CONC (FLUME)SY 6.0006 105 6045REMOVING STAB BASE AND ASPH PAV (2"-8")SY 29.0007 110 6002EXCAVATION (CHANNEL)CY 11.3008 110 6003EXCAVATION (SPECIAL)CY 314.0009 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 562.00010 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 2,842.00011 164 6005BROADCAST SEED (PERM) (URBAN) (SANDY)SY 2,842.00012 168 6001VEGETATIVE WATERINGMG 56.00013 169 6002SOIL RETENTION BLANKETS (CL 1) (TY B)SY 634.00014 169 6004SOIL RETENTION BLANKETS (CL 1) (TY D)SY 2,122.00015 351 6002FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")SY 17.20016 432 6001RIPRAP (CONC)(4 IN)CY 5.00017 465 6233INLET (COMP) (TY SIDEWALK BRIDGE)EA 4.00018 465 6389INLET (COMPL)(TY SIDEWALK BRIDGE)(MOD)EA 1.00019 500 6001MOBILIZATIONLS 1.00020 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 7.00021 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 100.00022 506 6011ROCK FILTER DAMS (REMOVE)LF 100.00023 506 6035SANDBAGS FOR EROSION CONTROLEA 261.00024 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 1,337.00025 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 1,337.00026 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 875.00027 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 875.00028 529 6001CONC CURB (TY I)LF 2,103.00029 530 6004DRIVEWAYS (CONC)SY 841.00030 530 6021DRIVEWAYS (ACP) (TYPE 2)SY 478.00031 531 6001CONC SIDEWALKS (4")SY 3,097.00032 531 6004CURB RAMPS (TY 1)EA 6.00033 560 6025RELOCATE EXISTING MAILBOXEA 1.00034 644 6068RELOCATE SM RD SN SUP&AM TY 10BWGEA 5.00035 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 579.00036 666 6230PAVEMENT SEALER 24"LF 579.00037 677 6007ELIM EXT PAV MRK & MRKS (24")LF 238.00038 752 6007TREE REMOVAL (18" - 24" DIA)EA 3.00039 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 1.00040 61856002TMA (STATIONARY)DAY 71.00041 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $16,000.00