COUNTY: KENDALL HIGHWAY: CS LENGTH: 0.0670MI CONTROL NUMBER: 0915-11-028 DBE GOAL: 0.0 % PROJECT NUMBER: BR 1102(443) TYPE: REHABILITATE BRIDGE AND APPROACHES TIME FOR COMPLETION: 86 WORKING DAYSGUARANTY: 11,000.00 BIDS RECEIVED UNTIL: 1:00 PM OCTOBER 04, 2017*EST.COST: 581,951.38 BIDS WILL BE OPENED: 1:00 PM OCTOBER 04, 2017 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONMICHAEL COWARD, P.E. ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 1832 N. SIDNEY BAKER 200 E RIVERSIDEKERRVILLE, TX 78028 AUSTIN TX 78704-1204830/257-8444 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: SEVENTH ST AT CYPRESS CREEK LIMITS TO: . ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 3.0001 105 6058REMOVING STAB BASE & ASPH PAV (10"-12")SY 483.0002 110 6001EXCAVATION (ROADWAY)CY 108.0003 110 6002EXCAVATION (CHANNEL)CY 1,119.0004 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 181.0005 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 311.0006 164 6007BROADCAST SEED (PERM) (URBAN) (CLAY)SY 311.0007 168 6001VEGETATIVE WATERINGMG 5.0008 169 6001SOIL RETENTION BLANKETS (CL 1) (TY A)SY 311.0009 247 6041FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)CY 128.00010 275 6001CEMENTTON 7.00011 275 6009CEMENT TREAT (NEW BASE) (8")SY 573.00012 310 6009PRIME COAT (MC-30)GAL 115.00013 316 6240AGGR(TY-PD GR-4 SAC-B)CY 11.00014 316 6410ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)GAL 367.00015 400 6005CEM STABIL BKFLCY 23.00016 416 6002DRILL SHAFT (24 IN)LF 372.00017 420 6013CL C CONC (ABUT)CY 13.80018 420 6029CL C CONC (CAP)CY 12.60019 420 6037CL C CONC (COLUMN)CY 8.40020 420 6156CL C CONC (WEBWALL)CY 17.80021 422 6015APPROACH SLABCY 46.00022 422 6019SLAB SPANCY 84.50023 432 6036RIPRAP (STONE PROTECTION)(30 IN)CY 525.00024 432 6045RIPRAP (MOW STRIP)(4 IN)CY 25.00025 450 6006RAIL (TY T223)LF 174.00026 496 6001REMOV STR (BOX CULVERT)EA 1.00027 500 6001MOBILIZATIONLS 1.00028 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 6.00029 506 6001ROCK FILTER DAMS (INSTALL) (TY 1)LF 60.00030 506 6011ROCK FILTER DAMS (REMOVE)LF 60.00031 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 156.00032 506 6024CONSTRUCTION EXITS (REMOVE)SY 156.00033 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 144.00034 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 144.00035 540 6001MTL W-BEAM GD FEN (TIM POST)LF 100.00036 540 6007MTL BEAM GD FEN TRANS (TL2)EA 4.00037 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 4.00038 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 2.00039 644 6023IN SM RD SN SUP&AM TYFRP(1)UA(P)EA 2.00040 644 6076REMOVE SM RD SN SUP&AMEA 3.00041 658 6016INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)EA 16.00042 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 16.00043 666 6170REFL PAV MRK TY II (W) 4" (SLD)LF 514.00044 666 6207REFL PAV MRK TY II (Y) 4" (SLD)LF 714.00045 672 6009REFL PAV MRKR TY II-A-AEA 10.00046 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $12,000.00