COUNTY: TRINITY HIGHWAY: CR LENGTH: 0MI CONTROL NUMBER: 0911-40-030 DBE GOAL: 0.0 % PROJECT NUMBER: BR 2024(071) TYPE: BRIDGE REPLACEMENT TIME FOR COMPLETION: 57 WORKING DAYSGUARANTY: 10,000.00 BIDS RECEIVED UNTIL: 1:00 PM MAY 02, 2024*EST.COST: 489,153.00 BIDS WILL BE OPENED: 1:00 PM MAY 02, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJESSE SISCO ATTN: CONSTRUCTION DIVISION - M1C3.02 1805 N TIMBERLAND DRIVE 6230 E. STASSNEY LANELUFKIN, TX 75901 AUSTIN TX 78744-3147936/633-4331 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: HAMILTON ROAD AT TRIB OF JAMES CREEK LIMITS TO: . ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 3.3501 110 6001EXCAVATION (ROADWAY)CY 109.0002 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 127.0003 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 1,492.0004 162 6002BLOCK SODDINGSY 150.0005 164 6009BROADCAST SEED (TEMP) (WARM)SY 746.0006 164 6011BROADCAST SEED (TEMP) (COOL)SY 746.0007 164 6054BOND FBR MTRX SEED (PERM)(RURAL)(SAND)SY 1,492.0008 168 6001VEGETATIVE WATERINGMG 62.7009 247 6073FL BS (CMP IN PLC)(TY D GR 1-2) (6")SY 706.00010 400 6005CEM STABIL BKFLCY 52.00011 416 6002DRILL SHAFT (24 IN)LF 273.00012 420 6013CL C CONC (ABUT)CY 21.00013 422 6007REINF CONC SLAB (SLAB BEAM)SF 1,300.00014 425 6012PRESTR CONC SLAB BEAM (5SB15)LF 247.41015 432 6033RIPRAP (STONE PROTECTION)(18 IN)CY 351.00016 450 6019RAIL (TY T631LS)LF 124.00017 454 6021TYPE A JOINTLF 53.80018 496 6016REMOV STR (PIPE)EA 2.00019 500 6001MOBILIZATIONLS 1.00020 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 8.00021 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 75.00022 506 6011ROCK FILTER DAMS (REMOVE)LF 75.00023 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 112.00024 506 6024CONSTRUCTION EXITS (REMOVE)SY 112.00025 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 728.00026 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 728.00027 540 6001MTL W-BEAM GD FEN (TIM POST)LF 113.50028 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 2.00029 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 2.00030 552 6003WIRE FENCE (TY C)LF 300.00031 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 6.00032 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $3,500.00