COUNTY: COLLIN HIGHWAY: FM 75 LENGTH: 1.0950MI CONTROL NUMBER: 0387-01-014 DBE GOAL: 5.0 % PROJECT NUMBER: STP 1702(817) TYPE: OV, BS REP TIME FOR COMPLETION: 105 WORKING DAYSGUARANTY: 26,000.00 BIDS RECEIVED UNTIL: 1:00 PM AUGUST 08, 2017*EST.COST: 1,369,798.43 BIDS WILL BE OPENED: 1:00 PM AUGUST 08, 2017 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONBRENAN HONEY, P.E. ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2205 S. SH 5 200 E RIVERSIDEMCKINNEY, TX 75069 AUSTIN TX 78704-1204972/542-2345 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: MAIN ST LIMITS TO: CR 461 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 57.8001 104 6017REMOVING CONC (DRIVEWAYS)SY 350.0002 110 6001EXCAVATION (ROADWAY)CY 58.0003 132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY 477.0004 134 6004BACKFILL (TY A OR B)STA 57.8005 150 6001BLADINGSTA 57.8006 164 6015STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)SY 24,413.0007 164 6051DRILL SEED (TEMP)(WARM OR COOL)SY 24,413.0008 168 6001VEGETATIVE WATERINGMG 3,253.0009 344 6032SUPERPAVE MIXTURES SP-C SAC-B PG64-22TON 3,944.00010 351 6008FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")SY 1,630.00011 354 6002PLAN & TEXT ASPH CONC PAV(0" TO 2")SY 16,508.00012 354 6004PLAN & TEXT ASPH CONC PAV(0" TO 4")SY 13,840.00013 400 6006CUT & RESTORING PAVSY 231.00014 402 6001TRENCH EXCAVATION PROTECTIONLF 214.00015 432 6024RIPRAP (STONE COMMON)(DRY)(12 IN)CY 54.00016 462 6019CONC BOX CULV (8 FT X 4 FT)LF 45.00017 464 6003RC PIPE (CL III)(18 IN)LF 1,174.00018 464 6005RC PIPE (CL III)(24 IN)LF 128.00019 464 6008RC PIPE (CL III)(36 IN)LF 76.00020 464 6009RC PIPE (CL III)(42 IN)LF 60.00021 464 6010RC PIPE (CL III)(48 IN)LF 113.00022 466 6009HEADWALL (CH - FW - 0) (DIA= 36 IN)EA 2.00023 466 6097HEADWALL (CH - PW - 0) (DIA= 24 IN)EA 2.00024 466 6101HEADWALL (CH - PW - 0) (DIA= 36 IN)EA 2.00025 466 6103HEADWALL (CH - PW - 0) (DIA= 48 IN)EA 4.00026 466 6181WINGWALL (PW - 1) (HW=6 FT)EA 2.00027 467 6357SET (TY II) (18 IN) (RCP) (3: 1) (P)EA 102.00028 467 6462SET (TY II) (42 IN) (RCP) (3: 1) (P)EA 2.00029 496 6006REMOV STR (HEADWALL)EA 2.00030 496 6007REMOV STR (PIPE)LF 1,403.00031 500 6001MOBILIZATIONLS 1.00032 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 5.00033 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 140.00034 506 6011ROCK FILTER DAMS (REMOVE)LF 140.00035 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 155.60036 506 6024CONSTRUCTION EXITS (REMOVE)SY 155.60037 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 140.00038 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 140.00039 530 6004DRIVEWAYS (CONC)SY 350.00040 530 6005DRIVEWAYS (ACP)SY 2,054.00041 530 6008TURNOUTS (ACP)SY 82.00042 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 31.00043 560 6012MAILBOX INSTALL-D (TWW-POST) TY 4EA 2.00044 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 31.00045 644 6002IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)EA 9.00046 644 6030IN SM RD SN SUP&AM TYS80(1)SA(T)EA 2.00047 644 6033IN SM RD SN SUP&AM TYS80(1)SA(U)EA 4.00048 658 6002INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)EA 6.00049 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 20.00050 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 2,601.00051 662 6110WK ZN PAV MRK SHT TERM (TAB)TY YEA 578.00052 666 6018REFL PAV MRK TY I (W)6"(DOT)(100MIL)LF 24.00053 666 6042REFL PAV MRK TY I (W)12"(SLD)(100MIL)LF 215.00054 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 252.00055 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 10,994.00056 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 11,196.00057 672 6009REFL PAV MRKR TY II-A-AEA 143.00058 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $52,200.00