COUNTY: MOORE HIGHWAY: US 287 LENGTH: 2.3010MI CONTROL NUMBER: 0066-04-083 DBE GOAL: 5.5 % PROJECT NUMBER: F 2B24(080) TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 51 WORKING DAYSGUARANTY: 51,000.00 BIDS RECEIVED UNTIL: 1:00 PM MAY 03, 2024*EST.COST: 2,571,556.40 BIDS WILL BE OPENED: 1:00 PM MAY 03, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONL. CLINT HARMS ATTN: CONSTRUCTION DIVISION - M1C3.02 5715 CANYON DR 6230 E. STASSNEY LANEAMARILLO, TX 79114 AUSTIN TX 78744-3147806/356-3247 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: FM 281 LIMITS TO: SHERMAN COUNTY LINE ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6017REMOVING CONC (DRIVEWAYS)SY 50.0001 105 6054REMOVING STAB BASE & ASPH PAV (18")SY 4,028.0002 105 6092REMOVING STAB BASE AND ASPH PAV (5"-8")SY 1,094.0003 106 6002OBLITERATING ABANDONED ROADSY 1,094.0004 112 6002SUBGRADE WIDENING (DENS CONT)STA 26.0005 132 6002EMBANKMENT (FINAL)(DENS CONT)(TY A)CY 3.0006 134 6001BACKFILL (TY A)STA 22.0007 150 6002BLADINGHR 26.0008 164 6036DRILL SEEDING (PERM) (RURAL) (CLAY)AC 5.0009 164 6053DRILL SEEDING (TEMP)(WARM OR COOL)AC 3.00010 247 6472FL BS(CMP IN PLC)(TY A,B OR D GR4)(12")SY 7,388.00011 310 6009PRIME COAT (MC-30)GAL 1,848.00012 416 6029DRILL SHAFT (RDWY ILL POLE) (30 IN)LF 160.00013 420 6009CL A CONC (COLLAR)EA 2.00014 460 6003CMP (GAL STL 24 IN)LF 125.00015 464 6005RC PIPE (CL III)(24 IN)LF 312.00016 467 6380SET (TY II) (24 IN) (CMP) (6: 1) (P)EA 4.00017 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 1.00018 480 6001CLEAN EXIST CULVERTSEA 2.00019 496 6004REMOV STR (SET)EA 8.00020 496 6007REMOV STR (PIPE)LF 227.00021 500 6001MOBILIZATIONLS 1.00022 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 4.00023 506 6040BIODEG EROSN CONT LOGS (INSTL) (8")LF 300.00024 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 300.00025 530 6019DRIVEWAYS (ACP)(TYPE 1)SY 50.00026 536 6004CONC DIRECTIONAL ISLANDSY 402.00027 610 6009REMOVE RD IL ASM (TRANS-BASE)EA 1.00028 610 6323IN RD IL (TY ST) 50T-12-12(400W EQ)LEDEA 20.00029 618 6023CONDT (PVC) (SCH 40) (2")LF 4,525.00030 618 6047CONDT (PVC) (SCH 80) (2") (BORE)LF 835.00031 620 6007ELEC CONDR (NO.8) BARELF 5,600.00032 620 6008ELEC CONDR (NO.8) INSULATEDLF 11,200.00033 624 6008GROUND BOX TY C (162911)W/APRONEA 2.00034 624 6028REMOVE GROUND BOXEA 2.00035 628 6045ELC SRV TY A 240/480 060(NS)SS(E)SP(O)EA 1.00036 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 1.00037 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 16.00038 644 6028IN SM RD SN SUP&AM TYS80(1)SA(P-BM)EA 6.00039 644 6033IN SM RD SN SUP&AM TYS80(1)SA(U)EA 1.00040 644 6076REMOVE SM RD SN SUP&AMEA 10.00041 658 6060REMOVE DELIN & OBJECT MARKER ASSMSEA 34.00042 658 6086INSTL DEL ASSM (D-SY)SZ 1(YFLX)GNDEA 100.00043 662 6008WK ZN PAV MRK NON-REMOV (W)6"(SLD)LF 2,930.00044 662 6037WK ZN PAV MRK NON-REMOV (Y)6"(SLD)LF 5,153.00045 666 6035REFL PAV MRK TY I (W)8"(SLD)(090MIL)LF 3,623.00046 666 6047REFL PAV MRK TY I (W)24"(SLD)(090MIL)LF 114.00047 666 6053REFL PAV MRK TY I (W)(ARROW)(090MIL)EA 6.00048 666 6077REFL PAV MRK TY I (W)(WORD)(090MIL)EA 6.00049 666 6092REFL PAV MRK TY I (W)(RR XING)(090MIL)EA 1.00050 666 6098REF PAV MRK TY I(W)18"(YLD TRI)(090MIL)EA 142.00051 666 6308RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)LF 4,268.00052 666 6317RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)LF 2,230.00053 666 6320RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)LF 5,299.00054 672 6007REFL PAV MRKR TY I-CEA 80.00055 30776058SP MIXES SP-D SAC-A PG70-28TON 4,440.00056 30776075TACK COATGAL 3,541.00057 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00058 61856002TMA (STATIONARY)DAY 50.00059 61856003TMA (MOBILE OPERATION)HR 24.00060 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $14,500.00