Shop Drawings - Field Change Order Related Revisions
Fabrication Branch reviewers use
Plans Online as their
primary source for contract plan reference.
Field Change Order details are not generally available on Plans
Online by the time review submittals are being processed. As a
result, the Design Engineer must do the following:
- Forward bridge component revision sheets to the Fabrication
Branch to ensure timely and accurate reviews.
- Immediately forward to the shop plan reviewer any structural
changes that the Engineer of Record wants incorporated in the
fabrication item but which are not significant enough to warrant
a change order.
Send an email message to any of the
Shop Plan Review Contacts
containing the following information :
- District
- County
- Highway
- CSJ
- Project number
- Structure name
- Letting date
- Contractor and fabricator names
- Brief description of the changes
- List of the affected components
- Attach the .dgn, .pdf or .tif files of the revised sheets to
the email
This information will be added to a shop plan database and will
help improve review times by reducing submission cycles.
More
Information